The Chief Engineer HQ CE (P) Vartak C/O 99 APO
Sector : Highways
Project : Consultancy Services for Authority’s Engineer for supervision of Construction of two tunnels of length 0.475 km and 1.79 km at Sela Pass along with approach roads of length 9.775 km on Balipara-Chardwar-Tawang (BCT) road of NHDL specifications in West Kameng and Tawang Districts of Arunachal Pradesh under Project Vartak on Engineering, Procurement &Construction (EPC) mode” Length 12.04 km
National Highway & Infrastructure Development Corporation Limited, (Ministry of Road Transport & Highways, Govt. of India), PMU – Dimapur, Behind City Tower Building, NST Colony, Dimapur – Nagaland – 797112
Sector : Highways
Project : Consultancy Services for Authority’s Engineer for Supervision of:- (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package I) under NH(O)- TSP) (ii) Construction of 2 Laning with Hard Shoulder of Peren – Dimapur section on NH – 129A from Design Km 126.775 to Km 146.450 (Length – 19.675 Km) in the state of Nagaland on EPC mode (Pkg – II) under Bharatmala NH(O)
National Highways Authority of India, G-5 & 6, Sector-10, Dwarka, New Delhi 110 075
Sector : Highways
Project : Independent Engineer services (single consultancy package) for:-(i) Construction of proposed Rewari Bypass (NH-11) as Feeder Route in Rewari district in the state of Haryana (Design length – 14.40 km) on Hybrid Annuity Mode (HAM)- Package-IV (ii) Construction of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode.
Border Roads Organization Headquarters Chief Engineer Project Vartak Pin-931716 C/o 99 APO
Sector : Highways
Project : Consultancy Services for preparation of RSTC (Recce Survey And Trace Cut) And DPR (Detailed Project Report) For Construction of Lower Gompashyaro-Jangda-Broksar Road From Km 0.00 To Km 18.270 (Existing Net Length-18.270 Km) To NHSL Specifications Under 763 BRTF/ Project Vartak in Arunachal Pradesh State.
The Chief Engineer, Border Roads Organization HQ CE (P) Vartak, C/O 99 APO
Sector : Highways
Project : Consultancy Services for Preparation of Detailed Project Report (DPR) Including Land acquisition and Forest Clearance of Road Dirang-Mandala Between Km 0.000 And Km 28.000 From Cl-9 To NHDL Specifications (Net Length 28 Km) Under Project Vartak In The State of Arunachal Pradesh.
The Chief Engineer Project Beacon Headquarters Chief Engineer Project Beacon C/o 56 APO
Sector : Highways
Project : Consultant for Preparation of DPR for Construction of Road from Asha-Cheem-Agurdaligali-Apharwat-Sarson-Anita-Tristar from Km 0.00 to Km 61.25 to NHSL With Paved Shoulder Specifications Under 99 RCC / 760 BRTF, Project Beacon in J&K (UT).
National Highways Authority of India G-5 & G-6, Sector 10, Dwarka New Delhi 110 075.
Sector : Highways
Project : Independent Engineer Services for Construction of 4-Laning with Paved Shoulder of Bijni to Mandi Section from existing Km 202.815 to Km 208.000 of NH-20 (New NH-154) (Design Length 5.357 Km) including construction of Twin Tube Tunnel for a length of 3.500 Km of Pathankot-Mandi under NH(O) in Himachal Pradesh on Hybrid Annuity Mode basis (Package-VB)-
National Highways Authority of India G-5 & G-6, Sector 10, Dwarka New Delhi 110 075.
Sector : Highways
Project : Consultancy Services for Authority’s Engineer for Supervision of The Work of “Widening and Strengthening – Upgradation to 2 Lane with Paved Shoulder from Existing Chainage Km 192+980 To Km 229+820 (Design Chainage Km 162.800 To Km 198.180) (Package -VIII) Under 31 TF on Akhnoor – Poonch Road (Nh-144a) in the UT Of Jammu & Kashmir Under Project Sampark, Border Roads Organization (Bro) on EPC Mode.
National Highways InvIT Project Managers Private Limited +C13:C14
Sector : Highways
Project : Consultancy Services for Authority’s Engineer for Supervision of Construction of Initial Improvement works & supervision of ATMS/TMS installation under Tolling, Operation, and Maintenance & Transfer of Chittorgarh Bypass-Kota section (from km 891+929 to km 1052+429) of NH-27 in the state of Rajasthan
Project Information
Client:
The Sixmothers Group
Location:
Philadelphia, United States
Date:
February 14, 2021
Website:
www.clientwebsite.com