- Consultancy Services for Authority’s Engineer Services for Rehabilitation &Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 90.000 to km. 177.960 in the State of Bihar on EPC Mode (Package-II).
- Independent Engineer services (single consultancy package) for:-(i) Construction of proposed Rewari Bypass (NH-11) as Feeder Route in Rewari district in the state of Haryana (Design length – 14.40 km) on Hybrid Annuity Mode (HAM)- Package-IV (ii) Construction of Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 km) as Feeder route in the state of Haryana on Hybrid Annuity Mode.
- Detailed Project Report (DPR) & Pre-Tender activities for the implementation of Versova Virar Sea Link Project (VVSLP)
- Consultancy Services for Authority’s Engineer for Supervision of:- (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package-I Consultancy Services for Authority’s Engineer for Supervision of:- (i)“Construction of 2 laning with Hard shoulder of Peren- Dimapur section on NH 129A from Design Km 109.494 to Km 126.775 (Length – 17.281 Km) in the state of Nagaland on EPC mode (Package
- Consultancy services for Authority's Engineer for Supervision of (i) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 0.00 to design Km 10.500 [Design Length- 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package I) (ii) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29 and NH-39 (New NH-02) from Design Km 10.500 to design Km 21.00 [Design Length - 10.500 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package II) Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH-02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 21.00 to design Km 32.00 [Design Length - 11.00 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package III)
- Consultancy services for Authority’s Engineer for Supervision of Construction of two lane with paved shoulder of Kohima-Bypass Road connecting NH-39 (New NH-02), NH-150(New NH- 02), NH-61(New NH-29) and NH-39 (New NH-02) from Design Km 32.000 to design Km 43.454 [Design Length – 11.454 Km] in the state of Nagaland Under SARDP-NE on EPC Mode (Package-IV)” “Consultancy services for Authority’s Engineer for Supervision of Upgradation of existing road to 2-Lane with Paved Shoulder from Kohima to Mao from Km 185.540 to Km 211.709 (Design length – 26.249) of NH -39 (New NH – 02) under NH(O)
- Consultancy Services for preparation of RSTC (Recce Survey And Trace Cut) And DPR (Detailed Project Report) For Construction of Lower Gompashyaro-Jangda-Broksar Road From Km 0.00 To Km 18.270 (Existing Net Length-18.270 Km) To NHSL Specifications Under 763 BRTF/ Project Vartak in Arunachal Pradesh State.
- Consultancy Services for Preparation of Detailed Project Report (DPR) Including Land acquisition and Forest Clearance of Road Dirang-Mandala Between Km 0.000 And Km 28.000 From Cl-9 To NHDL Specifications (Net Length 28 Km) Under Project Vartak In The State of Arunachal Pradesh.
- Consultant for Preparation of DPR for Construction of Road from Asha-Cheem-Agurdaligali-Apharwat-Sarson-Anita-Tristar from Km 0.00 to Km 61.25 to NHSL With Paved Shoulder Specifications Under 99 RCC / 760 BRTF, Project Beacon in J&K (UT).
- Independent Engineer Services for Construction of 4-Laning with Paved Shoulder of Bijni to Mandi Section from existing Km 202.815 to Km 208.000 of NH-20 (New NH-154) (Design Length 5.357 Km) including construction of Twin Tube Tunnel for a length of 3.500 Km of Pathankot-Mandi under NH(O) in Himachal Pradesh on Hybrid Annuity Mode basis (Package-VB)-
- Consultancy Services for Authority’s Engineer for Supervision of The Work of “Widening and Strengthening - Upgradation to 2 Lane with Paved Shoulder from Existing Chainage Km 192+980 To Km 229+820 (Design Chainage Km 162.800 To Km 198.180) (Package -VIII) Under 31 TF on Akhnoor - Poonch Road (Nh-144a) in the UT Of Jammu & Kashmir Under Project Sampark, Border Roads Organization (Bro) on EPC Mode.
- Consultancy Services for Authority’s Engineer for Supervision of Construction of Initial Improvement works & supervision of ATMS/TMS installation under Tolling, Operation, and Maintenance & Transfer of Chittorgarh Bypass-Kota section (from km 891+929 to km 1052+429) of NH-27 in the state of Rajasthan
- Consultancy Services for Authority’s Engineer for Supervision of Rehabilitatio and Up-Gradation to 2 Lane with Paved Shoulder from Existing Chainage Km 166+100 To Km 192+980 (Design Chainage Km 146.700 To Km 162.800) (Package -Vii) Including Construction of Bhimber Gali Tunnel (Total Length Of Tunnel 1.100 Km) Under 31 TF On Akhnoor - Poonch Road (NH-144A) In The UT of Jammu & Kashmir Under Project Sampark, Border Roads Organization (BRO) on EPC Mode.
- Consultancy Services as Authority’s Engineer for Supervision of “Construction of Uni-Directional Twin Tunnels at Shinkun La Pass of Length 4.1 Km (approximate length) including Civil and Electrical/Mechanical work along with approaches connecting Darcha-Padam Highway to NHDL Specification in Himachal Pradesh and the UT” of Ladakh under Project Yojak on EPC Mode





